Colorado Mountain Bike Association

  • about comba
  • receive news
  • contact
  • join or donate
Home › Trail Building Projects › Buffalo Creek › Buffalo Creek News

Navigation

  • Rides and Events
  • Trail Building Projects
  • Advocacy
  • About COMBA
  • Contact
  • Join or Donate
  • Receive COMBA News

Sponsors & Partners

  • Advance Colorado
  • Anvil Bikeworks
  • Bikes Belong
  • City of Golden
  • Clif Bar
  • Colorado High School Cycling League
  • Colorado Trail Foundation
  • Contractors Equipment Center
  • CottonQuips.com
  • DHM Design
  • Elastic Lab
  • Feedback Sports
  • Felt Bicycles
  • Flowline Trail Design
  • Golden Bike Shop
  • Golden City Brewery
  • Great Divide Brewery
  • Green Mountain Sports
  • Integral Design Group, Inc.
  • International Mountain Bicycling Association
  • Native Eyewear
  • Oscar Blues
  • Peak Cycles
  • Pedal Pushers Cyclery
  • Petroleum Field Services
  • Pioneer Sand
  • Recreational Equipment Incorporated
  • Redstone Cyclery
  • Salvagetti Bicycle Workshop
  • Singletrack Factory
  • Smart Wool
  • Specialized
  • The Digital Frontier
  • The Hermanussen Family
  • Trips for Kids
  • TSR Agristruction
  • Verde BMX
  • Vitamin Water
  • Wash Perk
  • Wheat Ridge Cyclery
  • Woody's Wood Fired Pizza
  • Wrigley's Chicago Bar & Grill
  • Yeti Cycles

     

Search

Join us Saturday August 21st for Trail Building in Buffalo Creek

Our next workday will be this Saturday August 21st. In July we were able to complete over half of the singletrack needed to connect  the two granite ridges that the black diamond trail traverses in addition to refining sections of lower Charlie's Cutoff. This will Saturday we will finish the singletrack and move on to rock work on the lower granite outcropping. Feel free to join us around the campfire on Friday evening. Beer and brats provided on Saturday afternoon. Come catch up with your friends -- or make some new ones -- in Buffalo Creek this Saturday!

Please RSVP so we can plan food and drink, all the details about when and were to meet are provided in the RSVP thank you. 

In the Fall 2008, a group of local riders led by Keith Clarke and Stu Miller flagged a trail corridor which climbs to the top of a rocky ridge before descending back into the valley.  Construction began last year with volunteers contributing over 1,000 hours of work, but there is still much to be done. 

We have ten trail building days scheduled for this year: 4/17, 5/22 & 23, 6/19, 7/24 & 25, 8/21, 9/11, 9/25 and 10/16. The events on 5/22-23 and 7/24-25 will be back-to-the-basics camping weekends held at the Miller Gulch Trailhead. Note that our original opening trail buildig day on 3/27 has been canceled due to weather.

Please join us by RSVP'ing for one of our volunteer trail building days or find out more about the project.

‹ Final Buffalo Creek Volunteer Day, Sept 17th! up Join us September 11th and 12th for Trail Building in Buffalo Creek ›
  • about comba
  • receive news
  • contact
  • join or donate

COMBA • Colorado Mountain Bike Association | PO Box 280415 | Lakewood | CO | 80228