Colorado Mountain Bike Association

  • about comba
  • receive news
  • contact
  • join or donate
Home › Trail Building Projects › Buffalo Creek › Buffalo Creek News

Navigation

  • Rides and Events
  • Trail Building Projects
  • Advocacy
  • About COMBA
  • Contact
  • Join or Donate
  • Receive COMBA News

Sponsors & Partners

  • Advance Colorado
  • Anvil Bikeworks
  • Bikes Belong
  • City of Golden
  • Clif Bar
  • Colorado High School Cycling League
  • Colorado Trail Foundation
  • Contractors Equipment Center
  • CottonQuips.com
  • DHM Design
  • Elastic Lab
  • Feedback Sports
  • Felt Bicycles
  • Flowline Trail Design
  • Golden Bike Shop
  • Golden City Brewery
  • Great Divide Brewery
  • Green Mountain Sports
  • Integral Design Group, Inc.
  • International Mountain Bicycling Association
  • Native Eyewear
  • Oscar Blues
  • Peak Cycles
  • Pedal Pushers Cyclery
  • Petroleum Field Services
  • Pioneer Sand
  • Recreational Equipment Incorporated
  • Redstone Cyclery
  • Salvagetti Bicycle Workshop
  • Singletrack Factory
  • Smart Wool
  • Specialized
  • The Digital Frontier
  • The Hermanussen Family
  • Trips for Kids
  • TSR Agristruction
  • Verde BMX
  • Vitamin Water
  • Wash Perk
  • Wheat Ridge Cyclery
  • Woody's Wood Fired Pizza
  • Wrigley's Chicago Bar & Grill
  • Yeti Cycles

     

Search

Join us for a weekend of trail building in Buffalo Creek on May 22nd and 23rd

Join us for a fun weekend of trail building, camping, and friends in Buffalo Creek on the weekend of May 22nd and 23rd. Our April weekend was a huge success which saw the construction and armoring of several difficult rock sections and new singletrack leading to the peak of the ridge. In the upcoming build weekend we will be continuing work on the "black diamond trail" on building transitions from drops, berms, and connecting the trail to its lower intersection with Homestead trail. We also will be working on twisty new section of trail on Charlie's Cut-off. 

This weekend will be back-to-the-basics camping weekend. Join us for a single day or camp with us through the weekend. Beer will be provided  and brats will be on the grill Saturday afternoon.

Please RSVP using the link below and help us complete the trail in 2010:

   http://www.comba.org/content/buffalo-creek-trail-building-day-volunteer-registration

In the Fall 2008, a group of local riders led by Keith Clarke and Stu Miller flagged a trail corridor which climbs to the top of a rocky ridge before descending back into the valley.  Construction began last year with volunteers contributing over 1,000 hours of work, but there is still much to be done. 

We have ten trail building days scheduled for this year: 4/17, 5/22 & 23, 6/19, 7/24 & 25, 8/21, 9/11, 9/25 and 10/16. The events on 5/22-23 and 7/24-25 will be back-to-the-basics camping weekends held at the Miller Gulch Trailhead. Note that our original opening trail buildig day on 3/27 has been canceled due to weather.

Please join us by RSVP'ing for one of our volunteer trail building days or find out more about the project.

‹ Join us September 25th for Trail Building in Buffalo Creek up Next Buffalo Creek Trail Building Weekend July 24th and July 25th ›
  • about comba
  • receive news
  • contact
  • join or donate

COMBA • Colorado Mountain Bike Association | PO Box 280415 | Lakewood | CO | 80228